Reinsberg Group
  • Technical Panel
    • Glass Panel
    • Q Panel
  • Software – Hermes®
  • Ceiling Supply Unit

      • Motorized Column
      • Non-Motorized Column
    • S-Column
    • Abitus
    • Ares
    • Atlas
    • Tor
  • Bed Heads
    • Adonis
    • Ais
    • Antea
    • Aura
    • Aura Light
    • Icarus
    • N270
  • Projects
  • Tedisel Medical
  • News
  • Contact
  • Private zone
© 2025 Tedisel Medical. All rights reserved.
Tedisel Medical Tedisel Medical
  • Products
    • diamond_menu_tedisel_medical

      Technical Panel

      Glass Panel
      Q Panel

      submenu-software-tedisel-medical

      OR Software

      Hermes

      submenu-unidad_suministro_techo-tedisel-medical

      Ceiling Supply Unit

      Column
      > Motorized
      > Non-Motorized

      S-Column
      Abitus
      Ares
      Atlas
      Tor

      submenu-cabeceros-tedisel-medical

      Bed Head Units

      Adonis
      Ais
      Antea
      Aura
      Aura Light
      Icarus
      N270

  • Projects
  • Tedisel Medical
  • News
  • Contact
  • LOGIN
  • Products
  • Projects
  • Tedisel Medical
  • News
  • Contact
  • LOGIN
En
  • Spanish
  • French
  • Portuguese
Tedisel Medical
En
  • Spanish
  • French
  • Portuguese

Hospital room refurbishment: coordinating bedhead service connections

Hospital bedhead service connections need to be coordinated before walls and finishes are closed up. The construction drawing must match the service entry points of the chosen configuration, the bed position and the space required to install and maintain the unit. If any of these points remain unresolved, closing up the affected area should be postponed until they are clarified.

In a refurbishment, the difficulty often lies where elements procured or installed by different teams meet: the wall, building services, bedhead unit and furniture. A unit may meet the clinical brief yet still require changes to the design so that the services can connect correctly. The review needs to take place while routes and finishes can still be adjusted.

Conceptual isometric illustration of the wall, service connections and a bedhead unit with its cover removed.
Conceptual exploded view of the wall-to-bedhead interface: support framing, an opening in the wall lining and service routes into the unit. The detached front panel shows the medical gas outlets, electrical sockets and data connections, together with access to the interior for connection and maintenance. AI-generated image.

What needs to be coordinated at a service connection? The point where a building service reaches the bedhead unit, its route to that point and the connection requirements specified for the unit. This is different from the final outlet used by clinical staff. Both positions must be clearly identified in the project documentation.

A shared drawing for architecture, building services and equipment

The first step is to identify the room, bed space and revision of the bedhead unit to be supplied. A floor plan showing a generic rectangle does not define service entries, fixings or access points. Coordinating the interface with the wall requires the relevant views and sections, linked to our installation drawing.

A practical approach is to review the bed centreline, finished floor level, final wall lining thickness and equipment position together. Service connections can then be located against these references, and each trade can check that it is using the same datum points. Dimensions must come from the project and the unit documentation, rather than a product photograph.

The UK guidance HTM 08-03 on bedhead services addresses coordination between design and installation in relation to clinical practice at the bed space. It is used here as a technical reference; its UK provisions and solutions do not replace the requirements applicable to a project in Spain.

How the bedhead unit is integrated changes the construction review

The wall interface detail must be resolved for the chosen model. Our documentation describes Antea as a recessed model for inpatient care, suitable for integration into HPL panels and available in horizontal or vertical configurations. In a refurbishment, this integration requires the opening and finish to be coordinated with the configuration supplied.

The design review needs to establish where the wall finish ends, which parts must remain removable and how the interior is accessed. An image of Antea cannot establish a universal recess depth, nor can a solution be transferred from one room to another without checking the supporting structure and installation drawing.

Official product image of Antea in a vertical configuration, with medical gas outlets and electrical connections.
Antea in one of our product configurations. The product image does not define the opening or installation dimensions for a specific project.

Antea at Hospital de Viladecans: integrating services into the wall

At our Hospital de Viladecans project in Spain, we installed Antea alongside other solutions from our range. Its fully recessed design allows services to be integrated into the wall. The photographs show the vertical arrangement of the panels, with outlets grouped on the front and luminaires positioned above.

This configuration illustrates why bed space centrelines, outlet heights and their relationship with lighting and furniture should be reviewed together. In a refurbishment, the opening, fixings, service entries and maintenance access must be specified in the installation drawing for each unit.

Two vertical Antea panels at Hospital de Viladecans, with medical gas outlets above and electrical connections below.
Detail of our Antea panels at Hospital de Viladecans: medical gas outlets occupy the upper section, while electrical connections and controls are grouped below. Horizontal luminaires sit above the panels. Photograph of our project.
Wider view of a wall fitted with two Antea panels, overhead luminaires and side supports at Hospital de Viladecans.
Overview of our Hospital de Viladecans project: two vertical service panels are combined with luminaires providing indirect light upwards and with side supports. The image shows how the elements are arranged on the wall; dimensions and service connections are defined in the installation drawings.

For Icarus, our installation manual, version 4 dated 26 January 2026 (in Spanish), states that supplies enter through the sides and requires the drawings to be consulted to locate the entry points for the different systems. This has a specific implication: the route planned within the wall must reach the entry point defined for the unit.

The same manual states that installation and maintenance require parts of the enclosure to be removed. A decorative junction with the bedhead unit therefore also needs to be reviewed for technical access. A visually integrated result does not demonstrate that the unit can be dismantled in accordance with our instructions.

Official product image of the Icarus bedhead unit, with a horizontal configuration and rounded ends.
Icarus, one of our hospital bedhead units. The exact positions of the service entries are shown in the relevant installation drawing.

Icarus at Dubai VIP Ward: integrating the bedhead unit into the wall finish

At our Dubai VIP Ward project in Dubai, United Arab Emirates, we installed Icarus with a customised vinyl finish to the client’s specifications. Our project photographs show how the front panel finish continues the graphic pattern on the wall.

In a refurbishment, this type of solution requires the decorative finish to be coordinated with the unit’s geometry, its connections and the parts that must remain removable. The photographs allow the visible interface to be examined; the positions of concealed service connections, fixings and maintenance clearances must be checked against the drawings and instructions for the configuration supplied.

Front view of the Icarus bedhead unit at Dubai VIP Ward, with a blue graphic finish and three visible outlets on the left.
Front view of Icarus at Dubai VIP Ward: the graphic finish on the bedhead unit continues the blue wall pattern, while the outline of the unit and the three outlets on the left remain visible. Photograph of our project.
Oblique view of Icarus at Dubai VIP Ward showing its projection from the wall and the coordinated decorative finish.
The oblique view shows how far Icarus projects from the wall, its perimeter edge and the arrangement of the outlets on the front. The decorative finish maintains visual continuity with the wall covering. Photograph of our project.

Define who provides each service and where it connects

Coordination becomes verifiable when each service has a defined handover point and a responsible party. The following matrix is a proposed starting point for a project meeting. It must be completed with the actual installation references and requirements; it does not prescribe outlet quantities, cable sizes or pipe dimensions.

Information to agree before closing up the wall
Interface Information to record Parties involved in checking it
Wall and bedhead unit Supporting structure, finish, opening and fixing references specified in the design Architect, construction supervision team and supplier
Electrical supply Identified circuits, entry point and scope of supply Electrical engineer, installer and supplier
Medical gases Required services, connection point and applicable documentation Person responsible for medical gases, installer and supplier
Nurse call and data Specific systems, interfaces and connection requirements Communications team, systems integrator and supplier
Technical access Removable parts and space required to carry out work Maintenance team, architect and supplier

Procurement can include this matrix in the technical enquiry and ask the quotation to specify what is included, what falls to another contractor and which drawings require approval. The term “complete bedhead unit” does not, by itself, clarify who provides each connection or who checks its operation on completion.

Where room layouts are repeated, identify the variants too. A change in orientation, layout or services may require a different drawing. Recording the exception by room number is preferable to relying on a verbal correction during construction.

Check access before finalising the finish

The maintenance team needs to be involved before the construction detail is finalised. The practical question is whether the specified covers can be removed and whether service points remain accessible with the furniture in place. Our documentation defines the operations and clearances required; the design must accommodate them.

HTM 08-03 also recommends providing access to services for maintenance and retaining as-built drawings. Applying that principle, a useful review is to go through the construction detail with those who will work on the installation later: locate access points, identify which components are removed and check that the work has been allowed for.

This work complements the planning of flexible hospital rooms. In a specific refurbishment, adaptability depends on decisions that can be verified in drawings, components and access arrangements. It should not be assumed from the product name or the appearance of the bedhead unit.


Isometric infographic showing six checks: unit identification, dimensions, service entries, responsibilities, maintenance access and review records.
Conceptual isometric diagram of the wall and bedhead unit, with service routes and separated panels visible. The six annotations organise the review of the unit, dimensions, service entries, responsibilities, maintenance access and discrepancy records. AI-generated image.

Record the review before closing up

A review before closing up can be documented in a short record: the drawing and revision used, rooms affected, checks completed, outstanding discrepancies and the person responsible for resolving each one. Site photographs help document what will be concealed, but they need to be linked to a location and a drawing; a folder of images without context is difficult to use later.

If the installed service connection does not match the planned arrangement, the solution must be agreed and documented before work on the finish continues. A discrepancy should not be compensated for by making informal modifications to the bedhead unit. The record made before closing up is not acceptance of the installation either: the relevant checks and tests must still be completed before clinical use.

To help us assess a specific configuration, share the intended room use, views of the wall interface, required services and existing constraints with our team. This information allows us to review the configuration and its interfaces before construction limits the available options.

Frequently asked questions

What is the difference between a service connection and an outlet on a hospital bedhead unit?

A service connection is where a building service reaches the hospital bedhead unit; an outlet is the point of use where clinical equipment is connected. Coordinating both requires the route, the entry into the unit and the final connection positions to be defined for the configuration supplied.

What should be checked before closing up the wall around a hospital bedhead unit?

Before closing up the wall, compare the construction drawing with the bedhead installation drawing: model and configuration, bed centreline, finished floor level, wall lining thickness, supporting structure, fixings, service entries and maintenance access. Discrepancies affecting that area should be resolved and documented before the finish is installed.

Who should coordinate hospital bedhead service connections?

Coordination should be agreed between the architect, building services engineers, construction supervision team, installers and bedhead supplier, with input from maintenance. For each service, record who supplies it, where it is handed over, who connects it and who checks it. Procurement can incorporate these responsibilities into the scope of the contract.

How much space is needed to maintain a recessed bedhead unit?

Maintenance clearance is determined by the drawings and instructions for the chosen model and configuration. Check which covers are removed, how they are dismantled and whether service points remain accessible with the wall finish and furniture in place. A product photograph cannot establish these clearances.

What should be done if a service connection does not match the bedhead drawing?

If a service connection does not match the bedhead drawing, postpone closing up the affected area, identify the discrepancy and agree a solution with the project team and supplier. The correction must be documented before work continues; it should not be compensated for by making informal modifications to the unit.

Does closing up the wall mean the bedhead installation has been accepted?

No. The record made before closing up documents the checks and discrepancies at that stage, but it does not constitute acceptance of the bedhead installation or authorise clinical use. The relevant checks and tests for the equipment and its services must then be carried out in accordance with the project, our instructions and applicable requirements.

Planning a hospital room refurbishment?

Talk to our team about specifying and supplying the bedhead units for your project. Share your room layouts, service requirements and installation constraints so we can review the configuration with you.

Request a project quotation.

healthcare architecturehospital bedhead unitshospital engineeringhospital refurbishmentmaintenanceservice connections

Latest news

Hospital room refurbishment: coordinating bedhead service connections

Hospital room refurbishment: coordinating bedhead service connections

Before closing up a hospital wall, the bedhead unit and building services need a coordinated drawing. This guide explains how to define service entries, installation details, maintenance access and responsibilities, with documented examples of our Antea and Icarus bedhead units.
Hospital Bed Head Unit Accessories: Checking Loads and Compatibility Before Adding Equipment

Hospital Bed Head Unit Accessories: Checking Loads and Compatibility Before Adding Equipment

Before adding a monitor, tray or infusion support to a hospital bed head unit, check the complete installed configuration. This guide explains how to identify the right references, follow the load through the mounting and anchors, assess movement and access at the bed space, and document the decision.
Hygienic design of hospital equipment: facilitating cleaning in ICUs and operating rooms

Hygienic design of hospital equipment: facilitating cleaning in ICUs and operating rooms

How can fixed hospital equipment be easier to clean? This article examines high-touch surfaces, joints, material compatibility and maintenance access in ICUs and operating rooms.
Integrated operating room commissioning: acceptance testing before clinical use

Integrated operating room commissioning: acceptance testing before clinical use

A practical guide to testing systems, interfaces, ergonomics and degraded modes before an integrated operating room enters clinical use.
  • Hospital Bed Head Unit Accessories: Checking Loads and Compatibility Before Adding Equipment
    Previous PostHospital Bed Head Unit Accessories: Checking Loads and Compatibility Before Adding Equipment

Related Posts

Hospital Bed Head Unit Accessories: Checking Loads and Compatibility Before Adding Equipment

Hospital Bed Head Unit Accessories: Checking Loads and Compatibility Before Adding Equipment

Hygienic design of hospital equipment: facilitating cleaning in ICUs and operating rooms

Hygienic design of hospital equipment: facilitating cleaning in ICUs and operating rooms

Integrated operating room commissioning: acceptance testing before clinical use

Integrated operating room commissioning: acceptance testing before clinical use

tedisel-medical-reinsberg-group-logo

SANT LLUC, 69-81 08918 BADALONA (BARCELONA · SPAIN)
+34 933 992 058  [email protected]

made_in_barcelona_OK_tedisel_medical
TUV_certificado_ISO

© 2026 Tedisel Iberica SL. All rights reserved.
Privacy Policy. Legal Note. Cookies Policy.

Copy